* -5 Do 15 August | * -5 Do 15 August | ||
** Milestones: Dome Up | ** Milestones: Dome Up | ||
** commited volunteers: mc.fly, mwfc, oTTr, s3krit, valka | ** commited volunteers: mc.fly, mwfc, oTTr, s3krit, valka, kgz | ||
* -4 Fr 16 August | * -4 Fr 16 August |
Revision as of 14:14, 11 May 2019
If you would like to help out with buildup and teardown, please contact s3krit in IRC or Rocket Chat. Will need lots of help. Especially if you are a specialist such as:
- Woodworking
- Electronics (mainly blinken)
Volunteer list
buildup
coderobe
takedown
need Lists
Renting list
Preise / Bestellmöglichkeit für Tische, Stühle und Großzelte wird es geben, rechne nicht vor KW21 damit... 
Shopping list
Blinken
- 20 metre White LED Strips
- 10 metre RGB LED Strips (addressable or no?)
- 10 metre Red LED Strips
Construction materials
- Wood to cover floor for Kitchen and Bakery tents at the very least
- LOTS of hot glue (for waterproofing electronics)
- Wood attachment hardware (bolts, long and short screws, etc)
Tool requirements
Stick your name next to any of these if you are able to provide them
- Power drills
- Circular saws
- Router/"oberfraese"
- Hot glue guns
Buildings
- Bakery tent - 4x8m - requires floor
- Kitchen tent - 4x8m - requires floor
- Hackcenter tent - 4x8m
- Dome
- 2-3 smaller tents
- Big russian army tent
- Potentially a shed for the kitchen, so we use the kitchen tent as another hackcenter tent
- Large black-on-black spaceship with a red LED landing pad and blacklit base (see Crazy Ideas)
- Tiki bar
calendar
buildup
- -11 Fr 9 August
- Milestones: LKW leaves Storage Essen
- commited volunteers: mc.fly, mwfc
- -10 Sa 10 August
- Milestones: LKW from Storage Essen on site, at least one Tent up so we can store the stuff from the storage.
- commited volunteers: mc.fly, mwfc
- -9 So 11 August
- Milestones: LKW back to Essen
- commited volunteers: mc.fly, mwfc
- -8 Mo 12 August
- Milestones:
- commited volunteers: mwfc
- -7 Di 13 August
- Milestones:
- commited volunteers: mwfc, s3krit, valka
- -6 Mi 14 August
- Milestones:
- commited volunteers: mwfc, s3krit, valka
- -5 Do 15 August
- Milestones: Dome Up
- commited volunteers: mc.fly, mwfc, oTTr, s3krit, valka, kgz
- -4 Fr 16 August
- Milestones: intermediate Kitchen up and running, Expect Arrival of most volunteers
- commited volunteers: mc.fly, mwfc, oTTr, s3krit, valka
- -3 Sa 17 August
- Milestones: All big buildings up
- commited volunteers: mc.fly, mwfc, oTTr, s3krit, valka
- events: 10:00 milliways volunteer meeting of the day
- -2 So 18 August
- Milestones: Full kitchen is running.
- commited volunteers: mc.fly, mwfc, oTTr, s3krit, valka
- events: 10:00 milliways volunteer meeting of the day
pre-camp
- -1 Mo 19 August
- Milestones:
- commited volunteers: mc.fly, mwfc, oTTr, s3krit, valka
- events: 10:00 milliways volunteer meeting of the day
- 0 - Di 20 August
- Milestones:
- commited volunteers: mwfc, oTTr, s3krit, valka
- events: 10:00 milliways volunteer meeting of the day
camp
- 1 - Mi 21 August
- Milestones: milliways completely up and running
- commited volunteers:
- events:
- 2 - Do 22 August
- commited volunteers:
- events:
- 3 - Fr 23 August
- commited volunteers:
- events:
- 4 - Sa 24 August
- commited volunteers:
- events:
- 5 - So 25 August
- Milestones: Big cleanup / degarbage / takedown of not needed infrastructure begins
- commited volunteers:
- events:
takedown
- +1 - Mo 26 August
- Milestones:
- commited volunteers: mc.fly
- events: 10:00 milliways volunteer meeting of the day
- +2 - Mo 27 August
- Milestones: LKW to Essen leaves in the evening.
- commited volunteers: mc.fly
- events: 10:00 milliways volunteer meeting of the day
- +3 - Mo 28 August
- Milestone: Unloading LKW in essen, driving back to Berlin.
- Milestone: Milliways site clean
- commited volunteers: mc.fly
- events: 10:00 milliways volunteer meeting of the day