CCCamp 2019-buildup: Difference between revisions
(→camp) |
|||
Line 106: | Line 106: | ||
=== camp === | === camp === | ||
* 1 - | * 1 - Mi 21 August | ||
** Milestones: milliways completely up and running | ** Milestones: milliways completely up and running | ||
** commited volunteers: | ** commited volunteers: | ||
** events: | ** events: | ||
* 2 - | * 2 - Do 22 August | ||
** commited volunteers: | ** commited volunteers: | ||
** events: | ** events: | ||
* 3 - | * 3 - Fr 23 August | ||
** commited volunteers: | ** commited volunteers: | ||
** events: | ** events: | ||
* 4 - | * 4 - Sa 24 August | ||
** commited volunteers: | ** commited volunteers: | ||
** events: | ** events: | ||
* 5 - | * 5 - So 25 August | ||
** Milestones: Big cleanup / degarbage / takedown of not needed infrastructure begins | ** Milestones: Big cleanup / degarbage / takedown of not needed infrastructure begins | ||
** commited volunteers: | ** commited volunteers: |
Revision as of 13:18, 11 May 2019
If you would like to help out with buildup and teardown, please contact s3krit in IRC or Rocket Chat. Will need lots of help. Especially if you are a specialist such as:
- Woodworking
- Electronics (mainly blinken)
Volunteer list
buildup
coderobe
takedown
need Lists
Renting list
Preise / Bestellmöglichkeit für Tische, Stühle und Großzelte wird es geben, rechne nicht vor KW21 damit... 
Shopping list
Blinken
- 20 metre White LED Strips
- 10 metre RGB LED Strips (addressable or no?)
- 10 metre Red LED Strips
Construction materials
- Wood to cover floor for Kitchen and Bakery tents at the very least
- LOTS of hot glue (for waterproofing electronics)
- Wood attachment hardware (bolts, long and short screws, etc)
Tool requirements
Stick your name next to any of these if you are able to provide them
- Power drills
- Circular saws
- Router/"oberfraese"
- Hot glue guns
Buildings
- Bakery tent - 4x8m - requires floor
- Kitchen tent - 4x8m - requires floor
- Hackcenter tent - 4x8m
- Dome
- 2-3 smaller tents
- Big russian army tent
- Potentially a shed for the kitchen, so we use the kitchen tent as another hackcenter tent
- Large black-on-black spaceship with a red LED landing pad and blacklit base (see Crazy Ideas)
- Tiki bar
calendar
buildup
- -11 Fr 9 August
- Milestones:
- commited volunteers:
- -10 Sa 10 August
- Milestones:
- commited volunteers:
- -9 So 11 August
- Milestones:
- commited volunteers:
- -8 Mo 12 August
- Milestones:
- commited volunteers:
- -7 Di 13 August
- Milestones:
- commited volunteers:
- -6 Mi 14 August
- Milestones:
- commited volunteers:
- -5 Do 15 August
- Milestones:
- commited volunteers:
- -4 Fr 16 August
- Milestones:
- commited volunteers:
- -3 Sa 17 August
- Milestones:
- commited volunteers:
- events: 10:00 milliways volunteer meeting of the day
- -2 So 18 August
- Milestones:
- commited volunteers:
- events: 10:00 milliways volunteer meeting of the day
pre-camp
- -1 Mo 19 August
- Milestones:
- commited volunteers:
- events: 10:00 milliways volunteer meeting of the day
- 0 - Di 20 August
- Milestones:
- commited volunteers:
- events: 10:00 milliways volunteer meeting of the day
camp
- 1 - Mi 21 August
- Milestones: milliways completely up and running
- commited volunteers:
- events:
- 2 - Do 22 August
- commited volunteers:
- events:
- 3 - Fr 23 August
- commited volunteers:
- events:
- 4 - Sa 24 August
- commited volunteers:
- events:
- 5 - So 25 August
- Milestones: Big cleanup / degarbage / takedown of not needed infrastructure begins
- commited volunteers:
- events:
takedown
- +1 - Mo 26 August
- Milestones:
- commited volunteers:
- events: 10:00 milliways volunteer meeting of the day