CovenEMF2020

From Milliways
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

The Coven

Who's coming?

todo

  • Get list of all people
  • Organise Mumble Calls - x41
  • Check the tent is OK
  • Sort out what we need from milliways storage if anything
  • decide final art list
  • get all the stuff to emf storage / goats house
  • buildup plan
  • teardown plan

Infra

Coven Tent

Size: 3*9 M, depending if it actually works

In need of serious repair but will be checked for damage before EMF and fixed. In case it can't we can get a new tent but would rather use this one.

Plans:

  • Coven Art
    • Display some cool art from the folks at the coven
      • IckSie's Single LED
      • Goat's SIP Phone
      • Goat's Cat Array
    • Zines
      • V's Zine
      • Annie / Micheal Zine
  • Chill zone
    • Chill spot with nice lights, power, ethernet and seating

Things we need

  • Tent
  • Floor
    • Pallets or from Orga. Will update with more info
  • Speakers
  • Cushions
  • BIN!
    • BIN BAGS
  • Lights
    • LED strips everywhere
    • Fairy lights
  • Dedicated Music Machine
    • Old laptop?
  • Cooler
  • The UPS
  • Plugs
    • EU to UK Adapters (at least 4, make sure to mark them so we don't lose them)
    • At least 4 or 5 UK extenders.
  • Network Switch
    • Will need the super long ethernet cable + a fuck ton of small ones