CovenEMF2020: Difference between revisions

From Milliways
Jump to navigation Jump to search
(Created page with "== The Coven == === Who's coming? === === TODO === === Infra === * Tent 3 * 9 M ** Needs repaird ** Plans *** Chill Tent")
 
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
=== Who's coming? ===
=== Who's coming? ===


=== TODO ===
=== todo ===
 
* Get list of all people
* Organise Mumble Calls - x41
* Check the tent is OK
* Sort out what we need from milliways storage if anything
* decide final art list
* get all the stuff to emf storage / goats house
* buildup plan
* teardown plan


=== Infra ===
=== Infra ===
* Tent 3 * 9 M
==== Coven Tent ====
** Needs repaird
Size: 3*9 M, depending if it actually works
** Plans
 
*** Chill Tent
In need of serious repair but will be checked for damage before EMF and fixed.
In case it can't we can get a new tent but would rather use this one.
 
Plans:
* Coven Art
** Display some cool art from the folks at the coven
*** IckSie's Single LED
*** Goat's SIP Phone
*** Goat's Cat Array
** Zines
*** V's Zine
*** Annie / Micheal Zine
* Chill zone
** Chill spot with nice lights, power, ethernet and seating
 
==== Things we need ====
===== Misc =====
* Tent
* Floor
** Pallets or from Orga. Will update with more info
* Cushions
* BIN!
** BIN BAGS
* Cooler
===== Tech =====
* Speakers
* Lights
** LED strips everywhere
** Fairy lights
* Dedicated Music Machine
** Old laptop?
* Network Switch
** Will need the super long ethernet cable + a fuck ton of small ones
* The UPS
* Plugs
** EU to UK Adapters (at least 4, make sure to mark them so we don't lose them)
** At least 4 or 5 UK extenders.
===== Tools =====
* Hammer
* Ducktape (So Much)
* Rope
* Tarps

Latest revision as of 15:25, 10 March 2020

The Coven

Who's coming?

todo

  • Get list of all people
  • Organise Mumble Calls - x41
  • Check the tent is OK
  • Sort out what we need from milliways storage if anything
  • decide final art list
  • get all the stuff to emf storage / goats house
  • buildup plan
  • teardown plan

Infra

Coven Tent

Size: 3*9 M, depending if it actually works

In need of serious repair but will be checked for damage before EMF and fixed. In case it can't we can get a new tent but would rather use this one.

Plans:

  • Coven Art
    • Display some cool art from the folks at the coven
      • IckSie's Single LED
      • Goat's SIP Phone
      • Goat's Cat Array
    • Zines
      • V's Zine
      • Annie / Micheal Zine
  • Chill zone
    • Chill spot with nice lights, power, ethernet and seating

Things we need

Misc
  • Tent
  • Floor
    • Pallets or from Orga. Will update with more info
  • Cushions
  • BIN!
    • BIN BAGS
  • Cooler
Tech
  • Speakers
  • Lights
    • LED strips everywhere
    • Fairy lights
  • Dedicated Music Machine
    • Old laptop?
  • Network Switch
    • Will need the super long ethernet cable + a fuck ton of small ones
  • The UPS
  • Plugs
    • EU to UK Adapters (at least 4, make sure to mark them so we don't lose them)
    • At least 4 or 5 UK extenders.
Tools
  • Hammer
  • Ducktape (So Much)
  • Rope
  • Tarps