CCCamp 2019-kitchen

From Milliways
Revision as of 17:48, 10 September 2018 by Mc.fly (talk | contribs)

team

infrastructure

water

Critical

Water with the housewasserwerk worked fine but needs to be prepared

water required by

  • konvektomat
  • dishwasher
  • coffee machine

we need the right piping here. (negative pressure, food safe)

wastewater

Critical

we ruined the pump.

cooling

10m2 is more than enough (shelving?)

We will need a cooling trailer. Estimate

Share a food trailer with Geraffel?


sources

http://www.landfleischerei-peter-mueller.de/