WHY 2025 fieldday: Difference between revisions

From Milliways
Line 48: Line 48:
We have read the minutes of the WHY x Liquicity orga meeting [https://pad.ifcat.org/gesprekliquicity2mei2024?view# here] and were delighted to see a very brief mention of mcfly's idea linked to [https://generationav.net/wp-content/uploads/2023/09/wpl-leads-deployment-of-several-hundred-martin-audio-boxes-at-liquicity-festival-2-1980x892.jpeg Liquicity's Mirror Palace] (or spiegeltent) and we would love to explore this idea further.
We have read the minutes of the WHY x Liquicity orga meeting [https://pad.ifcat.org/gesprekliquicity2mei2024?view# here] and were delighted to see a very brief mention of mcfly's idea linked to [https://generationav.net/wp-content/uploads/2023/09/wpl-leads-deployment-of-several-hundred-martin-audio-boxes-at-liquicity-festival-2-1980x892.jpeg Liquicity's Mirror Palace] (or spiegeltent) and we would love to explore this idea further.
* May we run/organize a stage?
* May we run/organize a stage?
** does WHY orga take care of the tent (Financials\Teardown\Rental etc)?
Yes, but there are no promises/guarantees at this point. WHY Orga want to see a super cool concept and plan before they commit. They like the idea's we have discussed but we need to back it up with something to show, not just tell. If the plan / pitch is cool, we can talk further.
*** can/must we take anything into consideration?
*does WHY orga take care of the tent (Financials\Teardown\Rental etc)?
*** If shared financials, we'll need to discuss numbers \ sponsorship ASAP.
The tent, Van Rosmalen's [https://www.vanrosmalen.com/nl/spiegeltent/salon-perdu/ Salon Perdu], is a 20m diameter circular circus tent with wooden flooring and seated booths on the raised outer ring.
** May we assemble our own content and stage teams for which we already have an experienced group of people?
It is rented by the Liquicity festival, the rental could be extended by the WHY orga. Early estimate for this rental extension is €9.000 which WHY Orga would like us to cover in sponsorship etc.
** May we hook into WHY's volunteering system as normal?
*can/must we take anything into consideration?
*** This to ensure gaps, if any, are covered, and to offer
There are concerns from Content team about Milliways fully running our own stage from start to finish. They want to avoid us becoming our own event within the larger WHY event. They like the idea and are intrigued by the stage possibilities though so as a trade-off we may have to accept some subordinancy under the orga teams.
** Power requirements and timelines
*If shared financials, we'll need to discuss numbers \ sponsorship ASAP.
*** TBD
We need to discuss ASAP.
** Furniture requirements and timelines
*May we assemble our own content and stage teams for which we already have an experienced group of people?
*** TBD
Orfcourse, however as stated earlier, there may be some subordinance under orga teams.
*** See last year's [https://wiki.mch2022.org/Team:Moebelhaus pricelist] for indication
*May we hook into WHY's volunteering system as normal?
Spoken with Volunteering team member Tatiana and possible TL Okabe. It's reliant upon wehter or not we do a stage, but if we do, they are fine with us hooking into WHY-Engelsystem.
*Power requirements and timelines
Not discussed
*Furniture requirements and timelines
See last year's [https://wiki.mch2022.org/Team:Moebelhaus pricelist] for indication.<br />
Not discussed.


===Terrain \ Village \ Moebelhaus \ Volunteer \ Power ===
===Terrain \ Village \ Moebelhaus \ Volunteer \ Power ===

Revision as of 10:38, 17 June 2024

For the WHY_2025 Fieldday, we prepared some questions to help guide us. Read our handwritten notes here.

Who attended

  • mc.fly
  • obsidian
  • ArisValeborn (not necessarily as representative of milliways, rather as member of Security Team)
  • Junglerot
  • Ava

Location Overview

Satellite view

An overlay of where the fieldday photos were taken and which direction they were facing on top of an unmarked, empty map of the WHY2025 event site.

360° photos

mc.fly took some 360 degree photos.
Due to filesize limits, they currently can't be viewed on the wiki, however they can be viewed on our Seafile here.
It would be great if we can view them natively on the wiki in a panoviewer extension or something.

Map Interpretations

IMPORTANT: As of the Field Day, these interpretations are early guesstimates on layout. These interpretations have no guarantees.
See our handdrawn interpretations here. Page 1 is overlayed on an unmarked, empty map of the site. Page 2 is overlayed on the 2023 map of the Liquicity D'n'B festival.

field day preparation / Questions

Early guestimation on Milliways travellers for WHY will be ~200

Finance \ Content \ Volunteer \ Moebelhaus \ Power

As already known; We are very interested in running our own stage like at CCCamp23 but under a 'Cyber Circus' theme.
We have read the minutes of the WHY x Liquicity orga meeting here and were delighted to see a very brief mention of mcfly's idea linked to Liquicity's Mirror Palace (or spiegeltent) and we would love to explore this idea further.

  • May we run/organize a stage?

Yes, but there are no promises/guarantees at this point. WHY Orga want to see a super cool concept and plan before they commit. They like the idea's we have discussed but we need to back it up with something to show, not just tell. If the plan / pitch is cool, we can talk further.

  • does WHY orga take care of the tent (Financials\Teardown\Rental etc)?

The tent, Van Rosmalen's Salon Perdu, is a 20m diameter circular circus tent with wooden flooring and seated booths on the raised outer ring. It is rented by the Liquicity festival, the rental could be extended by the WHY orga. Early estimate for this rental extension is €9.000 which WHY Orga would like us to cover in sponsorship etc.

  • can/must we take anything into consideration?

There are concerns from Content team about Milliways fully running our own stage from start to finish. They want to avoid us becoming our own event within the larger WHY event. They like the idea and are intrigued by the stage possibilities though so as a trade-off we may have to accept some subordinancy under the orga teams.

  • If shared financials, we'll need to discuss numbers \ sponsorship ASAP.

We need to discuss ASAP.

  • May we assemble our own content and stage teams for which we already have an experienced group of people?

Orfcourse, however as stated earlier, there may be some subordinance under orga teams.

  • May we hook into WHY's volunteering system as normal?

Spoken with Volunteering team member Tatiana and possible TL Okabe. It's reliant upon wehter or not we do a stage, but if we do, they are fine with us hooking into WHY-Engelsystem.

  • Power requirements and timelines

Not discussed

  • Furniture requirements and timelines

See last year's pricelist for indication.
Not discussed.

Terrain \ Village \ Moebelhaus \ Volunteer \ Power

  • May we have dedicated water access for the Milliways village or minimum IBC service for our kitchen?
  • Stage Dependancy for location: At CCC and EMF, the Milliways Village is usually elongated, catering to travellers who intentionally camp closer to the party as well as offering a "quiet" (in so far as you can call it quiet) side of the village.
    • Can we organise the Milliways Village in proximity to the stage but with the option for a quiet "end"?
  • are we allowed to run a makerboat race on the Canal? :-)
  • May we hook into WHY's volunteering system for our kitchen?
  • We are interested in running our own infodesk, any concerns?
  • Like at other events, we assume small, pre-registered group(s) can be on-site for Days -1 + 0 and Days 6 + 7 - is this correct?
    • While we doubt later is necessary (teardown typically faster than buildup) if earlier is possible, we'd like to know (dome + deco)
  • Power requirements and timelines
    • TBD
  • Furniture requirements and timelines
  • Kitchen: Water plan

Huisstijl

  • What is your timeline for publication of Styleguide \ Brandbook?
    • Challenge Coin
    • Deco \ Art

Other notes

  • No music/noise after 01:00 during the event. Orga will make provisions for a 4-channel Silent disco from 01:00 - ???.
  • Main asphalt road through event site will be closed to public during the event. north-south paved cyclepath running past main gate may be closed to public during event. This is still TBD by orga.
  • Small floating crafts (boats, pontoons, buoys, etc) are allowed on most bodies of water within event site limits, notable exception is the lake at Logistics which is a registered bird sanctuary.
  • mc.fly has reached out to a professional chef for an early estimation on costs for filling the role of kitchen Manager + Equipment. This early estimate is €1500.
  • We need to be prepared to build flooring for all major constructions (Dome, infodesk, kitchen etc) in case weather looks bad. Ideally these are built weeks in advance. The site is prone to flooding and becomes a mudbath when wet.
  • Mail to Jail - We were approached by Konmei who notes that Chaos Post still has Milliways stamps, postcards, display cards, PR banners etc etc etc for Mail to Jail. If Milliways prepares a recipient list with names, addresses, sending/receiving instructions/restrictions etc, then Chaos Post ishappy to support with PR and Logistics. If we want to do this, we have to contact Konmei directly.
  • There is a 1MVA (That's 1000kVA, folks!) transformer on-site that orga has access to. There are a couple of 3x 400A powerlock terminals as well as 3x 63A CEE terminals spread across the site. There will be no generators.