CCCamp 2019-kitchen: Difference between revisions
No edit summary |
|||
Line 31: | Line 31: | ||
= sources = | |||
Butcher / Schlachterei: | |||
http://www.landfleischerei-peter-mueller.de/ | http://www.landfleischerei-peter-mueller.de/ |
Revision as of 17:48, 10 September 2018
team
infrastructure
water
Critical
Water with the housewasserwerk worked fine but needs to be prepared
water required by
- konvektomat
- dishwasher
- coffee machine
we need the right piping here. (negative pressure, food safe)
wastewater
Critical
we ruined the pump.
cooling
10m2 is more than enough (shelving?)
We will need a cooling trailer. Estimate
Share a food trailer with Geraffel?
sources
Butcher / Schlachterei: