= team = | |||
sources | = infrastructure = | ||
== water == | |||
Critical | |||
Water with the housewasserwerk worked fine but needs to be prepared | |||
water required by | |||
* konvektomat | |||
* dishwasher | |||
* coffee machine | |||
we need the right piping here. (negative pressure, food safe) | |||
== wastewater == | |||
Critical | |||
we ruined the pump. | |||
== cooling == | |||
10m2 is more than enough (shelving?) | |||
We will need a cooling trailer. Estimate | |||
Share a food trailer with Geraffel? | |||
== sources == | |||
http://www.landfleischerei-peter-mueller.de/ | http://www.landfleischerei-peter-mueller.de/ |
Revision as of 17:48, 10 September 2018
team
infrastructure
water
Critical
Water with the housewasserwerk worked fine but needs to be prepared
water required by
- konvektomat
- dishwasher
- coffee machine
we need the right piping here. (negative pressure, food safe)
wastewater
Critical
we ruined the pump.
cooling
10m2 is more than enough (shelving?)
We will need a cooling trailer. Estimate
Share a food trailer with Geraffel?